Watershed Restoration
In 2024, Tó Nizhóní Ání kicked off our Watershed Restoration efforts with the Tsiyi’ Tó Watershed Pilot Project and Training, a nine-month pilot in Hardrock, Arizona. In partnership with Natural Channel Design Engineering Inc., our campaign began phase one of the pilot project in the Tsiyi’ Tó Wash watershed located in northeast Hardrock. From the Tsiyi' Tó Wash, our team traversed upstream the headwaters of the Oraibi Wash for our first official project. Learn more about the Tsiyi’ Tó Pilot Project by visiting our landing page:
Daisy Kiyaani
Daisy Kiyaani, Hashk’aan Hadzohí, is the local resident who granted our organization permission and an invitation to initiate ecological restoration in her area within the community of Black Mesa/Kits'iilí, AZ. Daisy initially learned about our ecological restoration efforts through the Tsiyi’ Tó Watershed Pilot Project wrap-up presentation at a Black Mesa Chapter meeting in the Fall of 2024. Noticing the need for restoration in her local area, she offered to be the host site of our first restoration site within the Black Mesa/Kits’iilí Chapter community.
Reading the Landscape: Three Levels of the Watershed
The Upper Tier: Where It All Begins
The Middle Tier: Nature's Slow-Down Zone
The Lower Tier: Where We Focus Our Efforts
Introduced Structures for Tsé Adááłdááz Watershed
Traditional Structures: One Rock Dam, Navajo Bowl, Rock Rundown, Media Luna, and Log Sill.
Summer 2025 Interns
During the Summer of 2025, we had two student interns who were vital to the documentation and development of the Tsé Adááłdááz Watershed Project. Titus Bert, Kin Yaa'áanii, of Piñon/Black Spotted Mountain, AZ was our media intern. Titus took much of the photos found on this page. Makaius Marks, Tó Áhaní, of Bitter Springs/Flagstaff, AZ was our watershed intern. Makaius assisted our watershed lead Andrew with much of the field work and office work.
Latest Watershed News
What's Next?
The TNA Watershed crew is also eager to begin the survey and implementation of restoration structures within the realms of each crew members residence. Additional monitoring days at the Tsiyi’ Tó (Wood Springs) Wash Pilot Project will gain insight into how the land is responding to certain structures. With our Pilot Project serving as our longest-implemented project, we continue to learn more over time to improve our construction practices in each new project.
Contact Us
Andrew Atencia
andrew@tonizhoniani.org
Makaius Marks
makaius@tonizhoniani.org